How to source metal parts from China, step by step

Part of the sourcing & quality guide series — see all →

The buyers who get burned in China don't skip steps at random. They skip the same two: checking the factory before the quote, and checking the parts before the batch. Everything else is process.

Sourcing metal parts from China works — reliably, at any volume — when you run it as a sequence instead of a negotiation. Send the right file to the right factory, compare quotes that actually match each other, approve a first article before mass production, and inspect before anything ships. Here is the full process I run for clients, in eight steps, with the gates that keep each one honest.

The eight steps at a glance

  1. Get the drawing pack RFQ-ready — tolerances, material, quantities, delivery terms.
  2. Shortlist factories that match your part — by process, tonnage, and track record.
  3. Vet before you quote — capability, QA system, integrity.
  4. Run the RFQ so quotes are comparable — same pack, same questions, same terms.
  5. Read the quotes beyond the price line — cycle time, secondary ops, tooling terms.
  6. Approve samples or first articles — the gate before any batch exists.
  7. Run production with quality checkpoints — in-process, pre-shipment, documented.
  8. Ship on a deliberate Incoterm — who books freight, who clears customs, who owns the risk.
Steps 3 and 6 are the gates. Skip either one and the rest of the process becomes damage control.

Step 1 — Get the drawing pack RFQ-ready

A factory quotes the file you send, not the part you imagine. Before anything goes out, the pack needs: a 2D drawing with tolerances and GD&T where function demands it, a 3D model, a named material (6061-T6, not "aluminum"; ADC12, not "cast aluminum"), surface finish called out by type and thickness, and the commercial frame — annual volume, per-order quantity, and destination port or country. Anything you leave vague gets priced two ways: with a cushion, or optimistically and renegotiated after your deposit. I've written the drawing-side fixes in detail in the DFM checklist; run that pass before the pack leaves your desk.

Step 2 — Shortlist factories that match your part

China has tens of thousands of CNC shops, die-casters and sheet-metal plants. Most of them are wrong for your part — not because they're bad, but because the fit is specific. A 300-ton die-cast cell can't hold your 2 kg housing. A shop built around 3-axis milling will fight a 5-axis part. Shortlist by process and machine class first, then by anything they can prove about similar parts: material, size, tolerance, volume, export market. Five qualified candidates beat fifty generic ones — vetting depth matters more than list length.

Step 3 — Vet before you quote

This is the step most buyers skip, and it's the cheapest one. Before a single quote arrives, check that the factory is real, capable and honest: a live shop-floor video, a sample of a similar part with its inspection report, verified business and export licenses, and a drawing review where you watch them push back on the file. The full playbook — including the red flags that never appear in a brochure — is in How to vet a Chinese metal-parts factory without flying there. Do this before quoting and the talkers remove themselves for free.

Step 4 — Run the RFQ so quotes are comparable

Send the identical pack to every shortlisted factory, and ask three questions in writing with the quote: What does the price assume (material grade, finish, packaging)? What's excluded (tooling, freight, inspection)? What's the lead time, from what date — order placement, drawing approval, or deposit? Quotes that arrive without these answers aren't quotes; they're bait. One page of standard questions turns five random numbers into five comparable offers.

Step 5 — Read the quotes beyond the price line

Now compare — and expect the spread. On a machined part, quotes from real shops routinely vary 30–50%, and the cheapest is rarely the best read. Look at:

Interview the top two or three by video call. Fifteen minutes of technical conversation tells you more than the quotation letter does.

Step 6 — Approve samples or first articles

Before mass production exists, you approve one part — measured, not eyeballed. For machined parts this is a first article off the production setup; for castings it comes after tooling is cut. The report should balloon every dimension on the drawing with actual values, plus material certs and finish reports. Review it against the drawing, not against vibes: a first article with two out-of-tolerance features and a "minor deviation, please approve" note is a prediction of the batch, not an apology for one part. What to check, line by line, is in the first-article inspection guide. Nothing ships — nothing even runs — until this gate is signed.

Step 7 — Run production with quality checkpoints

Approved first article ≠ approved batch. Between those two sit weeks of production where anything can drift: material substitution, process shortcuts, packed-before-inspected. Keep three checkpoints in place:

If you can't be on the floor, the checkpoint reports are your floor. A factory that resents producing them is telling you something.

Step 8 — Ship on a deliberate Incoterm

The last decision isn't technical, but it moves money and risk: who books the freight, who clears customs, and where your liability ends. EXW, FOB and DDP each put those responsibilities somewhere different, and the wrong choice quietly adds cost or leaves you exposed at the worst moment. The trade-offs, with metal-parts specifics like tooling returns and crate weights, are in DDP vs EXW vs FOB.

The number that matters: total landed cost

Through all eight steps, keep one number honest: what the part costs delivered, inspected and usable — not what it says on the quotation line. The landed cost stack for a typical metal part looks like this:

Two suppliers rarely differ on the part price as much as they differ on the rest of the stack. A quote that is 10% cheaper but arrives with vague Incoterms, no inspection plan and a tooling payment wired to a different company name is not 10% cheaper. This is why steps 3 and 6 — the gates — protect the number, not just the quality.

Where I fit in

I run this sequence for a living, from inside China. The drawing pack gets a DFM pass before it leaves, the shortlist gets vetted on the ground, the first articles get reviewed by an engineer, and the batch gets inspected before it ships — by one accountable person instead of a chain of email threads. If you're sourcing for the first time, this process is the difference between a supplier relationship and a series of expensive surprises.

See the four capability domains →

Send a drawing and start at step 1 →

Common questions

The process routes through four vetted factories; start with the four manufacturing capabilities to see which ones a part like yours needs.